Infor production planning,
replanned when the week moves

Infor production planning with an AI agent: when a supplier email or a shift note breaks the week, Lleverage fits the jobs back onto work centres with room and moves the dates on planned and manufacturing orders in Infor. If two customers want the same slot, your planner chooses between the two options, which the agent writes out.

Invalid work email
Truck leaving the floodlit gate of a processing plant at dusk, steam rising from its chimneys

How does Infor production planning work with an AI agent?

In Infor, MRP proposes planned manufacturing orders and a planner checks material and capacity before releasing them. After release, the week keeps shifting. The agent keeps those orders on dates that hold. It works in 4 steps, and Infor stays the record.

01

Start from what Infor already planned

Customer orders, the forecast and the material plan, the planned orders MRP proposed and the manufacturing orders already released. In LN the same picture comes from Enterprise Planning, as planned production orders. A sales order our order agent creates in Infor joins the plan straight away.

02

Hear about the change where it is written

A supplier mails that the castings ship a day late, or the maintenance log says the CNC cell is down until two. Infor learns of it only when someone keys it in, so the agent reads the mail and the log itself, as soon as they are written.

03

Fit operations to work centres and the product structure

Each operation goes onto a work centre with room for it, in routing order, with your changeover rules and minimum runs. Components in the product structure are checked against stock and open purchase orders first, as a planner checks material before releasing a planned order.

04

Change the dates in Infor

Planned orders and released manufacturing orders get their new start and finish dates, so the next MRP run and the shop floor work from one week. A change that would make a customer order late waits for your planner, with both options spelled out.

Rows of production machines along a dimly lit factory floor, an operator at a control panel

What changes for production planning in Infor?

When an order, a machine or a delivery moves, the plan is rebuilt and the manufacturing orders in Infor get new dates. The floor works from current dates, and your planners decide the trade-offs between customers.

Learn more

Example data

Planning deskWeek 39 · replanned 07:44
Live
MonTueWedThuFri
Line 1Extrusion
SO‑5170SO‑5174SO‑5181
Line 2Moulding
SO‑5172SO‑5188SO‑5190
Assembly2 shifts
SO‑5168SO‑5176
Packing1 shift
SO‑5165SO‑5171SO‑5175
Now
SO‑5188 moved to WednesdayResin delivery slipped a day. Line 2 resequenced, manufacturing order dates moved in Infor, customer date still holds.
88%line load
6 hchangeover saved
94%plan adherence

Replanning a week in Infor around a late delivery.

A supplier delivery slips on a week that was already full. This is what the agent does with the schedule in Infor.

Example data

Lleverage
Planning agent AI coworker · Lleverage
Online
Plan next week for the Brakveld Techniek brewer line. Steel for TV-228 slips to Wednesday, we still ship Friday.
Lleverage
Building next week's schedule around the steel delay.
Weekly production plan Brakveld Techniek · Week 25
Planning Conflict found Optimising Ready
TV-228· 12 ovens 4 stations · 1 order Due Fri 20 Jun
MON 16
TUE 17
WED 18
THU 19
FRI 20
SAT 21
Cutting
Welding
Assembly
Packing
Ship by Fri
1.0d
1.0d
1.0d
1.0d
Placing jobs across the week Chain slips into Saturday Overlapped, ships Friday 20 Jun Line load 0%
Replanned, customer still on time. I overlapped the stations so TV-228 still ships Friday, and moved the manufacturing order dates in Infor.
Human in the loop

You decide which Infor order changes need a planner

Every constraint in the plan has a setting. A new date on a planned or released manufacturing order that keeps every promise goes into Infor on its own, and any trade-off between two customers waits for your planner, written out.

01How far it may move a jobWithin a shift, within a day, or never without asking.
02Your constraints decideCapacities, changeovers and minimum runs are never broken to make room.
03Promised dates come firstA date a customer already has is only moved by a person.

Example data

Line 2 · MouldingWed to Fri
WedThuFri
SO‑5172 SO‑5188 SO‑5190
Agent · moved itSO‑5188 to ThursdayResin one day late. The customer date still holds.
Person · your plannerTwo orders, one Friday slotNoordkamp Lagers or Brakveld Techniek ships a day late.
Noordkamp firstBrakveld Techniek first

Infor’s own planning tools or Lleverage: which fits when?

Infor plans production with MRP and planned manufacturing orders in M3, Enterprise Planning in LN, and Infor Supply Chain Planning with its Demand Planning and Production Scheduling products. We read the Infor Documentation Library, infor.com and the Lleverage docs on 18 November 2026.

Infor on its ownLleverage
What it gives the plannerIn M3, MRP puts a planned order in the material plan when it finds a shortage, and the planner releases it as a manufacturing order. LN Enterprise Planning plans a production plan in the master horizon and planned production orders in the order horizon.yes: a week the plant can run, with the orders already in Infor moved to dates that hold, and moved again when a delivery, a machine or a customer changes it.
Materials across the product structureStronger here: MRP breaks demand down through every level, order-initiated planned orders follow from the level above, and release can check material and tool availability against on-hand, allocation or available-to-promise.Reads the material plan, the shortages and the open purchase orders before it moves a job. We think Infor’s MRP is the better place to net material requirements.
Work centre capacityM3 schedules operations forward or backward when a planned order is released, with or without finite loading, and checks capacity with Load. Display per Product (CPS110). Interactive Gantt scheduling runs in integrated external systems. LN offers workload control, a constraint-based master-planning method.yes: every operation goes onto a work centre with room for its setup and run time, on every replan, and a week that cannot fit comes back with the clash named.
Sequence and changeoversInfor Production Scheduling, part of Infor Supply Chain Planning, schedules vessels, tanks and lines for process manufacturers, and recalculates changeover times from changeover matrices or rules when the sequence changes.yes: your planner’s changeover rules and sequence are set up as constraints with our engineers, and every replan keeps to them.
News from outside InforInfor Demand Sensing updates near-term plans from live signals such as orders, shipments and market events, and is embedded with select Infor ERPs. Reading a supplier’s email or a shift note is not described.yes: the agent reads the supplier’s email, the request in Teams and the shift note, and replans from them as they arrive.
AI agents for planningInfor’s Industry AI Agents, in limited availability, include a Manufacturing Order Agent that supervises planned and released orders and their schedule status. With the Infor Industry AI for Claude connector, for select Infor Velocity Suite customers, a planner asks which production orders are at risk, and Claude can recommend rescheduling and act in Infor once approved.yes: the agent moves the dates on planned and released orders itself, within the limits you set, on the Infor you run today.
Who decidesThe planner releases planned orders in Planned MO. Open (PMS170). A material or tool shortage can raise a warning, and release despite a shortage happens only if that option is switched on.yes: you set how far a job may move. A promised date only moves when your planner answers a card in Teams or Slack, and the agent carries on with that answer.
Learning how your planner worksPlanning follows the settings in Infor: planning methods, horizons and the release checks you switch on.yes: your planner shows the week on a screen-share call, the agent turns it into a Skill, and a person approves each change it learns from ratings.
Fits best whenDemand changes inside Infor, MRP and capacity checks are followed as they stand, and the week rarely moves once orders are released.Suppliers, machines and customers move the week by email and phone, and your planner spends the day changing order dates to keep up.

We think Infor’s MRP and Enterprise Planning should keep calculating what to make and buy, and if your week holds once orders are released they may be all you need. We think Lleverage fits when the schedule needs a planner every day because the news arrives outside Infor. More on when MRP and ERP need to talk.

Our engineers set it up with you.
It takes on more of the planning week as it learns.

Forward deployed engineers build the first plan beside your planners and connect it to Infor, so the replanning comes off the desk within a few weeks. From there it automates gradually: a correction becomes a change to the Skill once a person approves it.

Invalid work email
A busy operations office with people working at their desks
The FDE model Forward deployed engineers build the first line with your team.

They work inside your operation and turn the rules in your planner’s head into constraints with your team. The confidence line is yours, and the engineers who set it up learn how your floor runs.

If you preferSame agents Self-served Your own planners build it in Lleverage.

The ERP and MES connections, the capacities, the changeover rules and the log are yours to configure. Our documentation and support sit behind your team, and an engineer is a call away whenever you want one.

Talk to us about either ↗

Frequently asked questions

Does Infor have production planning?

Yes, in several places. M3 runs MRP and turns planned manufacturing orders into released ones, LN plans production in Enterprise Planning, and Infor Supply Chain Planning adds Demand Planning and Production Scheduling. The agent picks up where those stop: keeping released orders on dates that hold when a supplier, a machine or a customer changes the week.

Can Infor schedule against finite capacity?

Yes, in parts. M3 can schedule operations with finite loading when an order is released, and leaves interactive Gantt scheduling to integrated external systems. LN has workload control for constraint-based master planning, and Infor Production Scheduling serves process plants with tanks and lines. The agent places every operation only where a work centre has room, on each replan.

How is this different from Infor’s Industry AI Agents?

Infor lists a Manufacturing Order Agent that supervises planned and released orders and their schedule status, and a Material Planning Agent that interprets planning data. Both are in limited availability. The Lleverage agent changes the order dates itself, inside limits you set, and asks your planner in Teams or Slack before a customer date moves.

Does it replace Infor MRP or Infor demand forecasting?

No. MRP keeps proposing what to make and buy, and Infor Demand Planning or your own forecast keeps setting the demand. The agent takes the work after release: reading the late delivery, finding a work centre with room for the rush batch and changing dates order by order. Infor stays the record of every order.

How does Lleverage connect to Infor, and how long until it plans?

Infor is set up as a custom integration, in the cloud or on your own servers, with the access your planner has, and an on-prem system stays closed to the internet. The first process typically runs supervised within a few weeks, built by our forward deployed engineers. More on our integrations.